Hi,
I have a queer observation about PPF processing and need your inputs to investigate further.
The issue:
When I change the outbound delivery order (type OUTB) quantity to 0, but the same does not get reflected in ERP.
However, when I change the posting change document (type TWPR) quantity to 0, it correctly gets transferred to ERP
The investigation till now:
I compared the PPF tabs of both the documents, and found that the action for sending ERP delivery messages has not been triggered in case of OUTB, while it has successfully triggered for TWPR.
I analyzed the logs (SLG1) for action determination and found the following
OUTB document (where PPF was not triggered)
TWPR document (where PPF was triggered correctly)
In /SCDL/ACTION_CONF, both actions point to the same schedule condition /SCWM/MSG_SCHEDCOND.
I understand that there is a problem with the schedule condition determination, but am unable to investigate further. I am using SCM IDES 7.0. The document type configurations are standard.
Thanks!
Aroop